Obtaining a subscription
Obtaining a hitch-free and rapid subscription.
Go to your sales point or agency with your complete file or complete the form online
Documents to be provided:
Customer: company/enterprise
- 1 site plan
- 1 written application on the company’s/enterprise’s headed paper indicating either the registry number, the taxpayer’s number or the registration number in the register of associations for corporate persons
- Lease contract registered at the tax office in case of outstanding bills vis-à-vis the installation
Customer-administration
- 1 site plan
- 1 written application indicating either the registry number or the taxpayer’s number
- Lease contract registered at the tax office in case of outstanding bills vis-à-vis the installation
Service Regulations
The maximum timeframe to carry out a subscription on an existing connection as from the date of payment of Consumption Deposit by the Customer is:
- 03 working days in urban areas
- 05 working days in rural areas
Consumption Deposits (ASC) are not subject to any tax (VAT, etc.)
The payment of MV (Medium Voltage) consumption deposit depends on the issuance of a subscription bill.
MV subscription can be taken out for industrial, commercial or household use. For an effective taking out of a subscription, the Customer must:
- Send a written request to Eneo wherein the customer states notably his/her identity, his/her address and the load he/she wants to subscribe to or complete the form online.
- Provide a lease contract registered at the tax office relating to the MV supply point in case of outstanding bills vis-à-vis the installation.
- Pay consumption deposits except for State organs, Eneo offices, free points and free zone customers
State organs (Councils, CRTV, SNEC, CAMTEL, Universities, …) are obliged to pay Consumption Deposits.
Barême des prix d'un branchement Basse Tension (Hors Taxe) :
TYPE DE BRANCHEMENT | COÛT (FCFA) |
Panneau Supplémentaire Standard Social (Monophasé) | 20.350 |
Panneau Supplémentaire Premier Standard A et B (Monophasé) | 27.279 |
Equipement Standard Social (Monophasé) | 29.559 |
Panneau Supplémentaire Deuxième Standard A et B (Triphasé) | 42.309 |
Equipement Premier Standard A et B (Monophasé) | 47.934 |
Equipement Deuxième Standard A et B (Triphasé) | 88.973 |
NB: Le prix total du branchement pourra varier en fonction de la distance entre le réseau et le point de livraison (câble et poteau supplémentaire)
Coût d'un abonnement social :
Ancien Prix | Nouveau Prix | |
Abonnement 5 A | 9.000 FCFA HT | 5.300 FCFA HT |
Abonnement 10 A | 19.565 FCFA HT | 9.290 FCFA HT |
NB: Les demandes de Branchement et d'Abonnement sont déjà opérationnelle à travers l'Agence en ligne MyEasyLight
Coût d'un abonnement (Monophasé) :
Type d'Abonnement | Puissance souscrite | Ampérage (A) | Montant des Avances sur Consommations (FCFA) |
MONOPHASE (2 Fils) | 0.66 | 3 | 5 300 |
1.1 | 5 | 5 300 | |
2.2 | 10 | 9 290 | |
3.3 | 15 | 29 840 | |
4.4 | 20 | 40 110 | |
5.5 | 25 | 50 385 | |
6.6 | 30 | 60 655 | |
7.7 | 35 | 70 930 | |
8.8 | 40 | 81 200 | |
9.9 | 45 | 91 475 | |
11 | 50 | 102 680 | |
12.1 | 55 | 112 020 | |
13.2 | 60 | 122 295 |
Coût d'un abonnement (Triphasé) :
Type d'Abonnement | Puissance souscrite | Ampérage (A) | Montant des Avances sur consommations ( FCFA) |
TRIPHASE ( 4 Fils) |
3.3 | 5 | 29 840 |
6.6 | 10 | 60 655 | |
9.9 | 15 | 91 475 | |
13.2 | 20 | 122 295 | |
16.5 | 25 | 153 110 | |
19.8 | 30 | 183 930 | |
26.4 | 40 | 245 565 | |
33 | 50 | 307 205 | |
39.6 | 60 | 368 840 | |
46.2 | 70 | 430 475 | |
49.5 | 75 | 461 295 | |
52.8 | 80 | 492 115 | |
59.4 | 90 | 553 750 | |
66 | 100 | 615 385 | |
82.5 | 125 | 769 480 |
Coût indicatif HT des ouvrages de distribution :
OUVRAGES | COÛT (Hors Taxe) |
Ligne Moyenne Tension monophasée | 7.500.000 FCFA/KM |
Ligne Moyenne Tension triphasée aérienne en bois | 15.000.000 FCFA/KM |
Ligne Moyenne Tension triphasée aérienne en métallique | 20.000.000 FCFA/KM |
Ligne Moyenne Tension souterraine | 40.000.000 FCFA/KM |
Poste de distribution type H 61 | 5.000.000 FCFA |
Poste de distribution Monophasé | 3.000.000 FCFA |
Poste distribution cabine (desserte) | 30.000.000 FCFA |
Poste de livraison Moyenne Tension | 55.000.000 FCFA |
Pole Mounted Recloser (Disjoncteur HTA) | 15.000.000 FCFA |
NB : un devis détaillé est établi après descente sur le terrain de nos experts.
NB : La validité d’un devis de branchement est de 90 jours à compter de sa date d’établissement